To: Contractors Regarding Programs: EmPower New York & Assisted Home Performance Summary: Monthly Contractor Check-in Contact:[email protected]
NYSERDA Single Family Programs Update
Friday, September 1, 2023
8:30 a.m. – 9:30 a.m. ET
Webinar number: 2595 889 0419
Event password: Energy1
All attendees must register prior to joining the event. This process will allow you to add the meeting to your calendar and provides each individual with a custom link to join the meeting. Please do not share your link with anyone. To register, please click here.
All webinars are recorded and links to the recordings are available on the Contractor Support site.
The NYSERDA Standards and Quality Assurance, SQA, team regularly reviews statewide trends of nonconformances identified during Quality Assurance inspections. To assist contractors by enhancing their internal Quality Control, the SQA team will be sending out emails to contractors who have received the trending statewide nonconformance identified at least once during a Quality Assurance inspection. The emails sent to contractors will contain the nonconformance identified during one or more inspections performed over the past year from the installed energy efficient projects.
The goal is to ensure the installation of the safest and most reliable energy efficient projects for all households throughout New York. The SQA team will assist contractors to successfully pass all inspections and answer questions.
Below is an example of a trending statewide nonconformance identified:
REQUIREMENT: Combustion Appliance Zone (CAZ) safety issues have been corrected.
NONCONFORMANCE DESCRIPTION: CAZ and appliance related safety issues have been corrected per ANSI/BPI-1200 Sections 7.8.1.1, 7.8.1.3, 7.8.1.5, 7.8.2.2 and 7.8.4.
The most common reasons why this nonconformance is identified are because:
Vent/flue/connector piping does not have the minimum clearance from combustible materials per BPI-1200 and NYS Residential Code
Vent/flue connector is not pitched up from the appliance connection point to the chimney/vent connection.
To avoid this nonconformance we highly encourage the leadership and crew members to:
Maintain minimum required clearances between insulation, chimneys, vents and connectors. Repairs made to single wall vents and appliance connectors, such as holes made for combustion analysis should be covered with materials approved by NYS code, use of snap in metal plugs are recommended, foil tapes do not meet minimum code material requirements.
Replace/repair vents, flues, connectors to address leakage and improper pitch, this work scope item should be included as a health and safety measure.
Where the existing appliance flue outlet is too tall to install the flue/connector with the proper pitch per the appliance manufacturer specifications and/or code include replacement of the appliance with a heat pump or combustion appliance with a flue outlet that is low enough, for example a short gas fired hot water heater. This work scope item should be discussed with your account manager and should be included in the work scope as a health and safety measure for program review.
If you have any questions or need any assistance, please submit to:
To: Participating Comfort Home Contractors Regarding Programs: Comfort Home Pilot Program Summary: NO July Contractor Webinar Contact:[email protected]
The Comfort Home team will NOT be hosting a monthly contractor webinar for the month of July and will resume again in August for the August 28th webinar. A registration link for the August webinar will be distributed next month.
If you have questions reach out to the Comfort Home team at [email protected].
To: Participating Comfort Home Contractors Regarding Programs: Comfort Home Pilot Program Summary: Update to Blower Door Requirement Contact:[email protected]
All Load Reduction Installs with an On-Site Installation Date AND Assessment Date of 6/15/23 or later will REQUIRE both a Blower Door Test In and Out to be completed. If the Assessment Date is before 6/15/23 and the On-Site Installation Date is on or after 6/15/23 we will only require the Blower Door Test Out to be completed.
Scenario 1: Assessment Date: before 6/15/23 |Install Date: on or after 6/15/23
Pre Blower Door Test – optional
Post Blower Door Test – required
Scenario 2: Assessment Date: on or after 6/15/23 |Install Date: on or after 6/15/23
To: Participating Contractors Regarding Programs: EmPower New York, Assisted Home Performance and Residential Energy Assessment Program (REA) Summary: NY HEP Live Environment URL Contact: [email protected]
For contractors participating in EmPower New York and Assisted Home Performance, soon to be EmPower+, and the Residential Energy Assessment Program, the New York Home Energy Portal (NYHEP) can be accessed at https://homeportal.nyserda.ny.gov/, starting Monday, July 10.