IRA Data Entering Reminder

Program/s: EmPower+
To: EmPower+ Contractors
Summary: IRA Data Entering Reminder
Questions: If there are any questions, please contact Contractor Support

When entering measures in NYHEP, all contractors should be providing a total cost and a material cost per the below. The NYHEP field “Cost” and “Material Cost” within a measure should reflect the associated costs for each.

  • Cost” = Full cost of installing the measure, including labor and materials
  • Material Cost” = Cost of the product/unit being installed, and/or the materials required to properly install the measure.

The material cost and the total cost should not be the same value.

Below is a screenshot of NYHEP with the proper cost and material cost breakouts.

Splitting out the measures costs is required, especially for IRA HEAR funded projects. NYSERDA is required to complete monthly IRA reporting which includes providing equipment and labor cost for each IRA HEAR funded measure. In the event a contractor fails to capture the installation costs, the project will need to be reopened in NYHEP to allow for the contractor to update the measure costs appropriately.

If there are any questions, please reach out to contractor support to support.residential@nyserda.ny.gov or (800)- 284-9069.