Update to Blower Door Requirement
To: Participating Comfort Home Contractors
Regarding Programs: Comfort Home Pilot Program
Summary: Update to Blower Door Requirement
Contact: [email protected]
All Load Reduction Installs with an On-Site Installation Date AND Assessment Date of 6/15/23 or later will REQUIRE both a Blower Door Test In and Out to be completed. If the Assessment Date is before 6/15/23 and the On-Site Installation Date is on or after 6/15/23 we will only require the Blower Door Test Out to be completed.
Scenario 1: Assessment Date: before 6/15/23 |Install Date: on or after 6/15/23
- Pre Blower Door Test – optional
- Post Blower Door Test – required
Scenario 2: Assessment Date: on or after 6/15/23 |Install Date: on or after 6/15/23
- Pre Blower Door Test – required
- Post Blower Door Test – required