Section 5
5.1 | Contractor Expectations → rev. 07.10.2023
5.2 | Contractor Certifications → rev. 07.10.2023
5.3 | Electronic Signature Policy → rev. 12.11.2023
5.5 | EmPower+ NY Pricing → rev. 07.19.2023
5.6 | OTDA Heat Pump Offering → rev. 12.11.2023
5.7 | Not For Profit Guidance → rev.07.10.2023
5.8 | Pellet Stove Guidelines → rev.07.10.2023
5.9 | No Heat Guidelines → rev.08.17.2023
5.10 | Heat Pump Requirements → rev.07.10.2023
5.11 | Fossil Fuel Conversion Policy → rev.07.10.2023
5.12 | Energy Pricing → rev.12.11.2023
5.13 | Guidelines for Heating System Replacement → rev.07.10.2023
5.14 | Direct Install Measures → rev.07.10.2023
5.15 | EmPower+ Eligible Measures and Accessories → rev.09.05.2023
5.15a | Project Eligibility → rev.11.30.2023
5.16 | Determination of Workscopes and Incentive Caps → rev.07.10.2023
5.17 | Home Energy Assessment → rev.07.10.2023
5.18 | Measures and Installation Criteria → rev.09.05.2023
5.19 | Services to Rental Properties → rev.08.23.2023
5.21 | Project Assignment Process → rev.07.10.2023